Proprietary In-House Intelligence
Powered by our exclusive, continually learning AI model trained on nearly 50 years of local Sacramento commercial job data, historical unit costs, and structural engineering logs.
COMING SOON! / HORIZON FASTTRACK AI
Early-access registration is open. The Division 08 plan-upload portal is coming soon.
01 / PROPRIETARY, IN-HOUSE INTELLIGENCE
At Horizon Contract Glazing, we are rewriting the rules of commercial pre-construction. For nearly five decades, we have set the standard for storefront, window wall, and curtain wall fabrication across the Sacramento region from our West Sacramento facility. Now, we are combining nearly 50 years of our own real-world shop data with custom machine learning to give General Contractors, Pre-Con Managers, and Estimators an unmatched competitive edge.
Introducing Horizon FastTrack AI—our proprietary, in-house pre-construction engine. Unlike off-the-shelf software, this system was developed exclusively by Horizon and trained on decades of completed project archives, historical estimates, material yield calculations, and engineering logs from our own job history. Because it is an active learning system, it continually grows smarter with every drawing package processed.
01 / YOUR DIVISION 08 SET
Elevations · opening schedules · specifications
VIP plan-upload portal / coming soon
02 / HORIZON FASTTRACK AI
Project archives
Historical estimates
Material yields
Engineering logs
03 / YOUR EXECUTIVE PACKAGE
Spec-compliant base bid
Value-engineering matrix
Title 24 energy audit
Production availability review
Illustrative launch workflow. Early-access registration is available now; plan uploads and automated bid delivery will open with the portal.
02 / BASE BID + VALUE ENGINEERING
At launch, Horizon FastTrack AI is being developed to review complete Division 08 architectural PDF sets and prepare an executive bid package with a Base Bid and value-engineering options. Our target is a 24-hour initial review for eligible, complete submissions after acceptance; timing will depend on scope and availability. Alternatives will be reviewed against project performance requirements, approvals, and Title 24 documentation. Pricing, substitutions, fabrication availability, and installation dates are confirmed only in Horizon’s written proposal. Potential savings are project-specific—not an automatic discount.
ILLUSTRATIVE SCENARIO / NOT A PRICE PROMISE
Spec-compliant base bid
100%
Equivalent VE alternative
90–95%
Relative budget index only—not a live estimate or a project-specific quote.
Title 24 energy audit
U-factor
SHGC
VLT
01
Approve scope and proposal
02
Review production availability
03
Automation-powered CNC fabrication
04
Coordinate enclosure schedule
1200 Triangle Court, West Sacramento / Automated fabrication. Production availability is reviewed for each proposal and confirmed in writing.
WHAT YOU GET WITH HORIZON FASTTRACK AI
Powered by our exclusive, continually learning AI model trained on nearly 50 years of local Sacramento commercial job data, historical unit costs, and structural engineering logs.
A 24-hour initial-review target is planned for eligible, complete submissions after acceptance. Complex packages, incomplete plans, and capacity constraints may require more time.
Instantly compare your spec-compliant base bid against smart value-engineering options designed to solve budget overruns without sacrificing architectural intent.
Review U-factor, SHGC, and VLT against the stated project criteria. Final selections, calculations, and Title 24 compliance remain subject to the required project review and approval.
Review fabrication availability alongside the proposed scope. Production windows are subject to approved submittals, material availability, capacity, and the final written agreement.
Flag potential opening, hardware, and scope questions before fabrication. The project team resolves RFIs and approves final submittals; automated review does not replace that process.
EARLY ACCESS / SACRAMENTO GENERAL CONTRACTORS
Be first to hear when Horizon FastTrack AI goes live. We are inviting Sacramento-area general contractors to register their interest and help shape the launch. Early-access registration does not reserve production capacity or confirm a price or delivery date.
This is an interest form, not a plan upload. We’ll contact you about early portal access.
Email your plan sets directly to our bid desk or call the West Sacramento shop.